
Shandong Hongrun Group (China) Co., Ltd. is located in Jining, Shandong, China, the hometown of Confucius. We are a comprehensive industry and trade integrated enterprise that values quality and reputation.
Widely applied: Crawler rock drill are specifically designed for tunnel excavation, pipeline support, metro and water conservancy projects, and are key equipment for heavy-duty rock drilling construction.
Advanced technology: The Crawler rock drill integrates hydraulic control, intelligent operation, safety and environmental protection design, making construction more efficient and safe.
Performance upgrade: Comprehensive improvement in efficiency, control experience, reliability and adaptability.
The Structural Composition Of the Tunnel Construction Rig
Power system: Tunnel drill rig diesel/electric engine, stable output, suitable for high-intensity working conditions
Hydraulic system: main control hydraulic system, supports drilling, lifting, rotation and other operations
Crawler Tunnel Drilling Rig(Fourth generation) | |||
Drilling diameter | 0-200mm | Drilling frame travel | 2m |
Drilling depth | 0-50m | Drill rig turntable | 360 ° rotation |
Power head | Single hydraulic motor | Swing angle | Left and right 50° |
Desiel engine | Yuchai 4105 pressurize | Working method | Dual use of oil and electricity |
Working motor | 45kw | Weight | 6000kg |
Pressurize way | Oil cylinder chain pressurization | Dimension | 7900*1900*2300mm |
Hydraulic oil pump | 40/40/32 | ||
We understand your needs! Consulting and customized services, technical parameters are up to you, and products are born for you.
The Structural Composition Of the Tunnel Construction Rig
Multi-angle precision drilling; Crawler rock drill flexible drill arm, support multi-angle drilling and slope operation, automatic positioning and angle locking function, Crawler rock drillimprove construction accuracy
Stable structure; Crawler rock drill thickened steel structure, strong impact resistance, good stability, equipped with protective cover, lighting, emergency stop device to ensure construction safety
Easy maintenance, strong compatibility; modular structure, easy to disassemble and repair drilling tools and consumables are standardized, suitable for common specifications on the market
The Structural Composition Of The Crawler Rock Drill
1. Power system: Tunneling jumbo drilling rig diesel/electric engine, stable output, suitable for high-intensity working conditions
2. Hydraulic system: main control hydraulic system, supports drilling, lifting, rotation and other operations
3. Drill arm structure: multi-section arm design, supports multi-angle telescopic and positioning
4. Chassis system: crawler/wheeled structure, adapt to walking on complex terrain
5. Rotation/impact mechanism: built-in rotary head and impact device, enhance drilling penetration
6. Operating system: hydraulic operating table + visual electronic screen, supports remote control module expansion
7. Lighting and safety components: complete working lights, emergency brakes, protective covers
The Application Fields Of Tunnel Drilling RIGS
1.Tunnel construction
Conduit drilling, pipe support, face grouting holes
Initial support operations in large and medium-sized tunnel projects such as railways, highways, and water conservancy projects
2.Slope anchoring and landslide control
Anchor drilling and anchor cable hole construction in steep slopes and landslide areas
Basic operation equipment in geological disaster control and slope stabilization projects
3.Urban rail and underground projects
Prestressed pipe support and grouting holes in subway section construction
Auxiliary drilling support operations in urban underground space development
4.Water conservancy and hydropower projects
Slope support and foundation reinforcement drilling for reservoirs, dams, and tunnels
Anti-floating anchor cables, curtain grouting drilling and other foundation construction
5.Industrial and municipal foundation construction
Factory foundation pit wall, high-rise building anti-floating anchors, basement support
Drilling and blasting reserved holes and advance drilling operations in municipal road tunnel reconstruction and expansion projects
Packaging And Transportation
The whole machine is packed in export standard wooden boxes or iron frames
Transportation method: whole machine hoisting/separate packing, suitable for container transportation
Instructions, spare parts tool box, debugging manual, etc. are included
After-Sales Service
12-month warranty, lifelong maintenance support
Provide online technical guidance, fast delivery of accessories, remote debugging support
Provide on-site debugging and training services by overseas engineers (please consult for specific regions)
Provide whole machine operation video + regular technical upgrade supp
FAQ
Q1: What kind of strata is this drill suitable for?
A: The fourth-generation tunnel drilling rig is suitable for complex geology such as hard rock, medium-weathered rock, mudstone, gravel, etc.
Q2: How deep can the drill go in one hour?
A: It can reach 10-20 meters/hour under conventional rock formations. The actual efficiency depends on the geology and drill bit conditions.
Q3: Can it be equipped with a variety of drilling tools?
A: It supports alloy drill bits, spiral drill rods, casing drill tools, etc. of various specifications, and has strong adaptability.
Q4: Is it convenient to transport and install?
A: It can be transported in separate parts, easy to install, and generally debugging can be completed in 1-2 hours.
Q5: Can it be exported? What languages are supported?
A: It can be exported to more than 100 countries, and supports Chinese, English, Russian, and Spanish operating manuals and training materials.