
Shandong Hongrun Group (China) Co., Ltd. is located in Jining, Shandong, China, the hometown of Confucius. We are a comprehensive industry and trade integrated enterprise that values quality and reputation.
1. Three-in-one functionality for efficient construction:piling, pile extraction, and drilling all in one machine, saving time and effort!
2. Hydraulic drive for ultra-fast piling:2500mm/min piling speed doubles construction efficiency!
3. Multifunctional integration for cost savings:One machine can be used as many, reducing procurement and maintenance costs!
4. Rubber tracks for all-terrain versatility:Environmentally friendly and durable, suitable for a variety of complex road conditions, protecting the road surface without damaging it!
Road Guardrail Pile Driver - A Powerful Tool for Bridge, Highway, and Railway Construction
This road guardrail pile driver, independently developed by our factory, is designed specifically for bridge, railway, and highway guardrail construction. Featuring an engineering-grade rubber crawler track chassis, it offers excellent off-road capabilities, easily navigating complex terrain, improving construction efficiency, and facilitating transportation, making it an essential piece of equipment for construction sites.As an advanced pile driver for Guardrails, it demonstrates high adaptability and efficiency in practical applications.
Parameter Table
Engineering rubber crawler guardrail pile driving and pile pulling integrated machine+rotary drilling | |||
Product name | Guardrail pile driver | Oil cooler | 650*550*215 mm |
Engine | Yuchai ZY4105 turbocharged engine | Gear pump flow rate | 80-110 ml/min |
Engine power | 85 kw | Gear pump speed | 2500 r/min |
Maximum torque of walking motor | 1800 Nm | Pile driving efficiency | 2500 mm/min |
Walking speed | 5000-20000 m/h | Maximum pile height | 3.4-4 m |
Maximum traction speed | ≤30000 m/h | Slide travel | 700-3400 mm |
Left and right sliding stroke | 0-400 mm | Sliding navigation frame tilt angle | Left30° right 5° |
Gradeability | 30° | Frame front and rear adjustment angle | 0-20° |
Diesel tank | 60 L | Hydraulic leg | 100 model |
Hydraulic oil tank | 600*400*360 mm | Working dimension | 3.4*2.2*4.5 m |
Hydraulic hammer | |||
Model | DG100 | Number of blows per minute | 490-990 n/min. |
Working Flow | 45-85 Lpm | Impact frequency | 400-800 bpm |
Working Pressure | 147-167 Bar 150-170 kg/cm³ | Hydraulic hammer impact energy | 1550 J |
Gross weight | 479 kg | Sound power level | 88/116 LPA/LWA |
Driving flow-rate | 80-110 Litre/min | Hose diameter | 3/4 inch |
Striking frequency | 360-700 b.m.p | Diameter of tool | 100 mm |
Hydraulic hammer working flow rate | 90-120 i/min | Weight of tool | 31 kg |
Hydraulic hammer working pressure | 15-17 Mpa | / | / |
Sturdy Construction, Improved Efficiency
The road guardrail pile driver utilizes a high-strength alloy steel frame, offering strong impact resistance and excellent durability, making it suitable for high-intensity, long-term operations. Compared to traditional equipment, the highway guardrail construction pile driver significantly improves pile driving efficiency in hard ground, saving construction time and reducing labor and maintenance costs.
Precise Navigation, Flexible Adaptability to Various Terrains
The road guardrail pile driver is equipped with a hydraulic cylinder-controlled sliding navigation system. The hammer head can be adjusted to 30° (left tilt) and 5° (right tilt) to cope with slopes and irregular terrain, eliminating the need for frequent equipment movement and improving overall construction efficiency.
All-Terrain Adaptability, Stable Operation
The rubber tracks are suitable for a variety of terrains, including hilly, muddy, and soft soil, ensuring stable operation, preventing slipping and bogging, and reducing equipment transportation costs. The road guardrail pile driver can easily adapt to changing terrain requirements and is widely used as a pile driver for guardrail construction projects. It maintains high stability and operational continuity even in harsh environments.
Three-in-one integrated functions for high piling efficiency
The road guardrail pile driver has a built-in hydraulic hammer system with a pile driving efficiency of up to 2500mm/min. It integrates the three functions of pile driving, pile extraction and drilling in one, simplifying the construction process and improving efficiency.
Hydraulic positioning and intelligent adjustment, achieving a 4-meter operating height
The road guardrail pile driver’s hammer head is precisely adjusted via a hydraulic guidance system, with a maximum operating height of 4 meters, reducing equipment movement and improving operational accuracy and efficiency.
High-performance powertrain, enabling long-term continuous operation
The road guardrail pile driver is equipped with a high-efficiency engine and dual radiator system, ensuring that the equipment can run continuously for 8 hours under high-intensity operations without high temperature or speed drop, providing a stable and efficient construction experience.
Company Profile
Packaging and Shipping